Where Day 2 goes
Shenzhen’s production geography is real and consistent:
- Bao’an (west) — injection molding, metal work, final assembly at volume; where “the factory that quoted you” usually actually sits
- Longgang (east) — assembly and fulfillment belts, including the warehouses that consolidate and prep shipments
- The PCB/PCBA clusters — Shenzhen and neighboring Dongguan, for board-level work from prototype runs to production
A factory visit answers the questions email never does: is this a real production line or a trading desk with a showroom? How many lines are actually running? Who inspects, and when?
What we handle on Day 2
- Scheduling — we arrange visit appointments from your Day 1 shortlist (any third-party visit fees are billed at cost, before you decide)
- On-site interpretation — technical conversation in Mandarin, specs read against your sheet
- Written record — what each line showed, capacities, timelines, and the questions you didn’t know to ask
After the visit
Most buyers take one of three next steps: place a sample order, commission a pre-shipment inspection ($199) when production runs, or hand follow-up orders to us on 5% commission. Nothing is pushed; the notes are yours either way.
Honest limits
- We arrange visits to factories open to buyer meetings; a specific named factory may decline or charge a visit fee — that’s industry reality, not a service failure.
- Compliance (CE, FCC, RoHS and equivalents) is mapped with suppliers as a topic on the day; certification itself is done by accredited bodies, not by us.
- MOQs and tooling costs vary by product; your Day 1 notes record each supplier’s actual numbers — commonly, stock electronics start around the low hundreds of units and custom builds run higher.